• Large Equipment Painting and Baking Cabin with Overhead Conveyor Chain
  • Large Equipment Painting and Baking Cabin with Overhead Conveyor Chain
  • Large Equipment Painting and Baking Cabin with Overhead Conveyor Chain
  • Large Equipment Painting and Baking Cabin with Overhead Conveyor Chain
  • Large Equipment Painting and Baking Cabin with Overhead Conveyor Chain
  • Large Equipment Painting and Baking Cabin with Overhead Conveyor Chain

Large Equipment Painting and Baking Cabin with Overhead Conveyor Chain

After-sales Service: 24 Hours Online
Warranty: 2 Years
Type: Spray Booth
Certification: CE
Substrate: Steel
Brand: Infitech
Customization:
Diamond Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory
  • Overview
  • Product Description
  • Product Parameters
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
painting line
Coating
Powder Coating
Airflow Direction
Downdraft
Heating Mode
Gas Heating
Paint Mist Treatment
Dry-type
Condition
New
Extraction
Through 800mm Deep Pit with Grids
Carrying Capacity
900kg/Wheel
Walls
60mm Thick Rock Wool Panels
Lights
LED Lamps
Illumination
>1,000lux
Fan Units
Direct Drive Fan Units
Heats
Direct Gas Fired Heating System
Empty Loaded Air Speed
Over 0.25m/S
Transport Package
Cargo Loaded on Steel Frame Handled by Forklifts
Specification
18000x6000x5500mm (L X W X H)
Trademark
INFITECH
Origin
Guangzhou, China
HS Code
8419899090
Production Capacity
1000 Sets/Year

Product Description

Product Description

Large Equipment Painting and Baking Cabin with Overhead Conveyor Chain


1.FEATURES
The paint and bake cabin comes with large capacity allowing for painting and baking big size products. It is specially designed with overhead conveyor chain system and floor conveyor system, facilitating the transfer of heavy parts.
Infitech specializes in custom spray booth projects, providing customers with optimal solutions at competitive pricing.
 
Product Parameters

2.DETAILS

  1. Airflow: downdraft
  2. Extraction: through 800mm deep pit with grids (carrying capacity: 900kg/wheel)
  3. Gantry structure (made of square tubes) for reinforcing the strength of the cabin
  4. Walls: 60mm thick rock wool panels, 0.426mm thick substrate
  5. Lights: IP55 protection grade lighting fixtures, LED lamps, illumination>1,000lux
  6. Doors: Drive through manual entrance doors, with device to support the weight of the door panels
  7. Fan units: direct drive fan units
  8. Heats: direct gas fired heating system
  9. Empty loaded air speed is over 0.25m/s.
  10. With inverter control, energy-saving.
  11. Overhead conveyor system is integrated to the booth structure, ensuring spacious workspace and aesthetics.
  12. Floor conveyor chain for transfer of parts that cannot be suspended.
  13. Manual door in the middle for dividing the big size booth to 2 parts, allowing for two areas to work individually, increasing work flexibility and work efficiency.
Large Equipment Painting and Baking Cabin with Overhead Conveyor Chain
Packaging & Shipping

PACKAGING AND LOADING PHOTOS

Large Equipment Painting and Baking Cabin with Overhead Conveyor Chain
 
FAQ

FAQ

Q: What is the maximum working temperature of the paint and bake cabin?
A: 80ºC.

Q: The big size manual entrance door is very heavy. I would like to use electric entrance door for the paint and bake cabin.
A: That's okay. And we also recommend electric entrance doors.

Q: How long does it take to install this type of massive paint and bake cabin?
A: Approx. 30 working days by 3-4 people. However, the time might vary depending on different booth configurations.

Q: How to install the paint and bake cabin?
A: The paint and bake cabin is installed according to the steps below.
  1. Install the reinforced gantry structure
  2. Install the wall panels
  3. Install the entrance doors
  4. Install the ceiling panels
  5. Install the air handling unit
  6. Install the ducts
  7. Wiring
  8. Start-up
There are more detailed instructions to be supplied to help guide the installation.

Q: How often should I replace the filters?
A: For pre-filter bag filters, they need to be replaced once every month; ceiling filters (F5 grade filters) are replaced every 3 months; floor filters (fiberglass filters) are replaced every 15 days. The maintenance intervals are for reference only. They change subject to the actual working condition of the paint and bake cabin.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now