Auto Parts Painting Line/Car Accessory Powder Coating Paint Line
This set of equipment includes two sets of production lines: pretreatment line and powder spraying and PVC line.
The chain speed of the pretreatment line is 3.5 m/min, and it is mainly composed of a hanging conveyor chain, a moisture drying furnace, a spray room, a spray system and a hot water boiler. Powder spraying and PVC line chain speed of 3 m/min, composed of hanging conveyor chain, drying furnace, spray booth, PVC spray booth, isolation room, glue spray system, air supply system and waste gas treatment system.
PREPARATION LINE
NO. |
PROCESS |
PARAMETER |
HANDING |
LENGTH(m) |
NOTE |
TEMP(ºC) |
TIME(S) |
1 |
Loading |
RT |
|
|
|
manual |
2 |
Hot water washing |
40-60 |
180 |
spray |
10.5 |
boiler heating |
3 |
Pre-degreasing |
55-65 |
90 |
spray |
5.3 |
boiler heating |
4 |
Degreasing |
55-65 |
90 |
spray |
5.3 |
boiler heating |
5 |
Water washing 1 |
RT |
100 |
spray |
6 |
|
6 |
Water washing 2 |
RT |
100 |
spray |
6 |
|
7 |
Passivation |
15-45 |
180 |
spray |
10.5 |
boiler heating |
8 |
Water washing 3 |
RT |
100 |
spray |
6 |
|
9 |
Water washing 4 |
RT |
100 |
spray |
6 |
|
10 |
Drying |
130 |
300 |
|
|
Gas heating |
11 |
Cooling |
|
450 |
|
|
|
12 |
Unloading |
RT |
|
|
|
manual |
PAINTING LINE
NO. |
PROCESS |
PARAMETER |
HANDING |
LENGTH(m) |
NOTE |
TEMP(ºC) |
TIME(MIN) |
1 |
Loading |
RT |
|
|
|
Manual |
2 |
Drying |
120 |
20 |
|
|
Gas heating |
3 |
Powder coating |
|
|
|
|
Painting room |
4 |
Oven |
120-200 |
25-40 |
|
|
Gas heating |
5 |
PVC painting |
|
|
manual |
6 |
|
6 |
PVC drying |
125-180 |
25-30 |
|
|
Gas heating |
7 |
Cooling |
|
10 |
|
|
|
8 |
Unloading |
RT |
|
|
|
Manual |