Gold Member Since 2015
Audited Supplier
Guangzhou Infitech Mechanical and Electrical Equipment Co., Ltd.

Washing Booth, Water Curtain, Preparation Station manufacturer / supplier in China, offering Wet Type Painting Room with Ce, Yft-B Open-Face Industrial Spray Booth, Shot Blasting Machine and so on.

(/ )

Supplier Homepage Product Industrial coating machine Wet Type Painting Room with Ce

Wet Type Painting Room with Ce

FOB Price: Get Latest Price
Min. Order: 1 Set
Production Capacity: 200 Sets/Year
Transport Package: Export Professional Packages
Payment Terms: T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: Customized
  • Certification: CE
  • Coating: Painting
  • Paint Mist Treatment: Wet-type
  • Color: Customized
  • Popular in: Europe, Australia
  • Air Filtration Efficiency: >95%
  • Trademark: INFITECH
  • Origin: Guangzhou, China
  • Type: Coating Production Line
  • Substrate: Steel
  • Airflow Direction: Cross-flow Type
  • Condition: New
  • Warranty Time: 2 Years
  • Technology: German Techology
  • Noise: 85dB<
  • Specification: CE
  • HS Code: 8419899090
Product Description

:,,,,,,,,,.

The equipment mainly consists of: room body, air exhaust system, air filtration system, lighting system, paint mist treatment system, electronic control system and safety, fire control system, etc..
 

No.SpecificationItemSpecificationnote
1.
The internal dimensionmmCustomzied 
2.
Airflow Direction Cross-flow Type 
3.
Paint mist treatment Water rotation treatment 
4.
Exhaust gas treatment Activated carbon filter+Pulafei filter Option
5.
Total discharge volumem3/h12000/18000/25000 
6.
Exhaust fanKW/Set5.5KW/7.5KW/11KW 
9.
Air filtration efficiency >95% 
10.
LuminanceLUX≥1200 
12.
NoisedB(A)≤85 

Paint mist collection and processing system

Wet Type Painting Room with Ce
 Air containing paint mist through the exhaust fan, high speed suction swirl chamber. The centrifugal force paint mist from the air flow is separated from the air flow, and the water film is collected. Water is separated from the water retaining plate and prevents from the exhaust port. The paint mist is returned to the water tank by the return air pipe. The AB agent is added in the water tank, and the paint mist coagulant is composed of a A component and a B component.
After the vortex processing, the paint mist is discharged from the water trough to the varnish slag place. In the circulating water tank, a proper amount of paint mist coagulation agent is added regularly to ensure the water circulation of the circulating water pool (4 to 6 months).



Successful stories

Wet Type Painting Room with Ce

If you wish to discuss any aspect of your project

...Please feel free to contact us.. 
 

Thank you for your viewing !


 
Send your message to this supplier
Avatar
Mr. Lvon Li
Manager
*From:
To: Mr. Lvon Li
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now